Answer five questions about your space, power, and cooling. Everything runs in your browser and nothing is saved. These are planning-level figures from the same estimator Perimeter Compute's engineering team uses to size an Inference Hub, not an offer.
Enter the space size and spare power to run the screen.
Deployable capacity is governed by the shortest bar: -
Planning-level screen derived from Perimeter Compute's Inference Hub estimator: a percentage-rent structure, condenser-water tonnage charges, submetering fees, recovered waste heat, and incremental demand-response value at current placeholder rates. Every figure requires site verification and engineering review. Capacity math assumes 3-phase service at 0.95 power factor, continuous-load sizing, a power usage effectiveness of 1.15, and about 0.28 tons and 0.48 SF of program area per IT kW. Values are not an offer, quote, or commitment.
We look forward to building the future of metro-edge compute with you.